Forté on Flagler construction progress
I visited the property and took video of the construction progress at Forté on Flagler in West Palm Beach on November 10, 2024 (see video above). Forté on Flagler is planned for completion in 2025. It looks beautiful and I love the water views.
Building highlights:
- Located on South Flagler Drive in West Palm Beach
- 41 Condos
- Private Elevator entry to each Residence
- Spacious floor plans, each with 4+ Bedrooms, 4,000+ interior square feet and 1,000+ square feet of Balconies
- 2-story Penthouse with a customizable floor plan, 9,040 interior square feet, 1,800 square feet of Terraces on the main level and private Rooftop Terrace with 7,000+ square feet, Pool, outdoor Kitchen and a Cabana Bath with Sauna, enclosed steam shower and dressing area
- Stunning views of the Intracoastal, City, Ocean and Palm Beach Island
- Luxury amenities
Forté on Flagler launched sales in 2022 and the building is almost sold out. Currently, only 3 Condos remain available. Forté on Flagler is located next to the site of South Flagler House, which broke ground in April of 2024 and is planned for delivery in 2027.
Contact me and visit Forté on Flagler’s profile page to view property listings, floor plans and additional building details.
Related information: